What is the work done in using a cable that weighs 2 pound per foot to lift a weight of 800 pounds a distance of 500 feet?

Answer & Explanation

Jaelynn Cuevas

Jaelynn Cuevas

Expert

2022-07-04Added 16 answers

Work done = 9 × 10 5 ft. lb
The total weight of cable = 2 × 500 = 1000 l b
Load = 800lb
So total load = 1000 + 800 = 1800lb.
Work done = force x distance = 500 × 1800 = 900000 = 9 × 10 5 f t l b